Construction beginning today at Mirasol will impact walkways near the facility.
Contractors will begin work with building 504 before proceeding with building 506. For safety reasons, the Mirasol canal-side sidewalk will be closed for the duration of the project, as the roofs are located approximately eight feet away from the sidewalks.